Back to top
   Call Me Free Offline Send SMS Send Inquiry
Need help? Call us :

Cuplock Scaffolding System

We are holding immense expertise in manufacturing, exporting and supplying a wide range of Cuplock System. This category includes Cup Nut, Ledger Blade, Spigot Pin, Top Cup, Bottom Cup, Ledger, Adjustable U Head Jack Rod With Nut and many more. Our offered system is used in used in the construction industry for providing full support for the newly developed building and other infrastructure. This system is manufactured at our highly developed production unit using superior grade raw materials and the latest technology under the guidance of our adept professionals. Further, it is available in various specifications to meet the desired needs of our clients. This Cuplock System can be purchased by our clients at industry-leading prices.

Features:

Corrosion and abrasion resistance

Its sturdy construction leads to withstand high pressure

High tensile strength

Sturdy design with dimensional accuracy
Product Image (CC-306)

Cuplock Scaffolding

  • Supply Ability:as per required Per Week
  • Delivery Time:1 Week
Product Image (CC-303)

Ledger Blade

  • Delivery Time:1 Week
  • Supply Ability:as per required Per Week
Product Image (CC-308)

Spigot Pin

  • Delivery Time:1 Week
  • Supply Ability:as per required Per Week
Product Image (CC-201)

Scaffolding Tie Rod

  • Delivery Time:1 Week
  • Supply Ability:as per required Per Week
Product Image (CC-301)

Top Cup

  • Supply Ability:as per required Per Week
  • Delivery Time:1 Week
Product Image (CC-302)

Bottom Cup

  • Supply Ability:as per required Per Week
  • Delivery Time:1 Week
Product Image (CC-203)

Waller Plate

  • Supply Ability:as per required Per Week
  • Delivery Time:1 Week
Product Image (CC-304)

Standard

  • Delivery Time:1 Week
  • Supply Ability:as per required Per Week
Product Image (CC-305)

Scaffolding Ledger

  • Supply Ability:as per required Per Week
  • Delivery Time:1 Week
Product Image (CC-307)

Adjustable U Head Jack Rod With Nut

  • Delivery Time:1 Week
  • Supply Ability:as per required Per Week
Product Image (CC-205)

Shuttering Plate

  • Supply Ability:as per required Per Week
  • Delivery Time:1 Week
Product Image (CC-309)

Base Jack

  • Delivery Time:1 Week
  • Supply Ability:as per required Per Week
Product Image (CC-310)

Adjustable U Head

  • Supply Ability:as per required Per Week
  • Delivery Time:1 Week
X